CNIPA.AI
专利申请人记载

APPLICANTS

原始名称记载: SUSTAINABLU, LLC

浏览来源中的申请人名称,以及导入专利中保留的原始名称字段。

这里按名称检索,不代表已核验的法律主体。同名可能指不同个人或组织;别名和历史名称不自动合并。

此页精确匹配完整原始名称字段。字段可能包含多个申请人或其他记载主体角色,名称边界和法律主体尚未核验;保留全部标点,不进行拆分。

1 条已索引专利记录

专利数量指本站收录的去重专利记录,不是该申请人的完整专利总量。联合名称字段不代表单一企业。

目前没有可核验的数据覆盖日期和最后导入时间。专利公开日期不等于导入日期。目录缓存可能使新导入记录延迟出现。

在本地原始申请人字段中搜索包含这段完整文字的记录,可能包括联合名单或更长名称;这不是精确主体检索。

按此申请人条件检索专利
№ US20260002362A1发明专利
审中

AUTOMATED OPTIMIZED STORMWATER ROOF RETENTION SYSTEMS WITH INTEGRATED LEAK DETECTION

AUTOMATED OPTIMIZED STORMWATER ROOF RETENTION SYSTEMS WITH INTEGRATED LEAK DETECTION

In an exemplary embodiment, a system for releasing stormwater on a rooftop of a building structure includes at least one drain water retention device including a float control device to measure volumetric stormwater retained in the rooftop and a valve to operatively open a drain when the measured volumetric stormwater is exceeded, at least one leak detection device configured to detect a water leak, located under an underlying surface of the rooftop, the at least one leak detection device detects the leak in response to change in relative humidity levels or dew point under the underlying surface of the rooftop, and a controller, executing control instructions, in communication with the at least one drain water retention device for selectively controlling the valve in accordance with the control instructions, the controller includes a storage associated with the controller for storing the control instructions. The control instructions are performed according to the steps of measuring the volumetric stormwater retained in the rooftop, determining a duration of time of stormwater retained in the rooftop, determining a location of the building structure to provide prior estimated precipitation and atmospheric conditions, defining a predefined allowable tolerance, and comparing the measured volumetric stormwater with the predefined allowable tolerance and, if the measured volumetric stormwater exceeds the predefined allowable tolerance, opening the drain to remove the stormwater.

❖SUSTAINABLU, LLCAnthony MAYER§ 1/14 权利要求E4D 13/4, E3F 1/, E4D 13/ +111