PREDICTIVE BATTERY ANALYSIS
PREDICTIVE BATTERY ANALYSIS
A system includes a battery assembly, a control board, a first load control board, and a second load control board. The control board may be configured to implement a diagnostic load test of the battery assembly by controlling the first load control board and the second load control board to discharge the battery assembly. The first load control board may discharge the battery assembly according to a first current for a first duration and the second load control board may discharge the battery assembly according to a second current for a second duration. The control board may collect battery data to determine a state of health of the battery assembly.