AUTOMATED PILE MARKER

発明審査中
7閲覧数
20請求項 · 2 独立
§ Ⅰ

案件概要

発明者

Brandon Roy Hunter; Adam Hansel; Soren Jensen

IPC分類

H2S 20/10G1C 9/6G1C 15/10G1D 11/30

CPC分類

H2S20/10G1C9/6G1D11/30G1C2009/66G1C15/105

In a large construction site, it can be challenging to maintain precise installation for multiple piles. If the piles are not installed accurately, subsequent installation process may have to be changed, adjusted, or adapted due to the actual pile construction. System and method embodiments of pile marking for subsequent bracket installation are disclosed. A laser marker is installed on a pile in a row of piles to emit one or more laser projections onto a pile to generate one or more marks based on one or more offsets that are established during piles scanning and validation. These marks may be used to ensure correct subsequent bracket and solar table installation.

原文(中国語)

In a large construction site, it can be challenging to maintain precise installation for multiple piles. If the piles are not installed accurately, subsequent installation process may have to be changed, adjusted, or adapted due to the actual pile construction. System and method embodiments of pile marking for subsequent bracket installation are disclosed. A laser marker is installed on a pile in a row of piles to emit one or more laser projections onto a pile to generate one or more marks based on one or more offsets that are established during piles scanning and validation. These marks may be used to ensure correct subsequent bracket and solar table installation.

外部リソース