Bridge and construction method of bridge
데이터 출처: EPO OPS
현재 전문을 불러올 수 없습니다. 조회된 기본 정보는 계속 확인할 수 있습니다.
개요
출원 번호
CN202310304573
발명자
ZUO XUENA; RUAN HUIQIANG
출원일
Mar 21, 2023
공개일
Sep 24, 2024
특허 패밀리 ID
92777719
IPC 분류
CPC 분류
The invention discloses a bridge and a bridge construction method. The bridge comprises a track beam; the bridge pier assembly is arranged below the track beam, the bridge pier assembly comprises a bridge foundation and a bridge pier, the bridge foundation is arranged below the bridge pier, the bridge foundation comprises a first concrete part, a plurality of first main reinforcements, a plurality of second main reinforcements and a first sleeving piece, the first main reinforcements are arranged at intervals in the length direction, and the second main reinforcements are arranged at intervals in the width direction; the plurality of first sleeving pieces are arranged at intervals in the width direction; and the first sleeving piece is connected to the outer side of the second main reinforcement in a sleeving mode, the second main reinforcement can move relative to the first sleeving piece, and the first concrete part wraps part of the first main reinforcement and the first sleeving piece. The movable space is reserved through the first sleeving piece, so that in the connection construction of the track beam and the pier, more movable space is provided for the second main reinforcement through the first sleeving piece, other additional operations such as engineering rework or reinforcement planting caused by mutual conflict of the reinforcements can be avoided, and the construction period is prevented from being delayed.
EPO 조사 자료
항목을 선택하면 해당 공개문헌의 공식 자료를 조회합니다.
위 항목을 선택하여 자료를 확인하세요.