AUTOMATED PILE MARKER
개요
발명자
Brandon Roy Hunter; Adam Hansel; Soren Jensen
IPC 분류
CPC 분류
In a large construction site, it can be challenging to maintain precise installation for multiple piles. If the piles are not installed accurately, subsequent installation process may have to be changed, adjusted, or adapted due to the actual pile construction. System and method embodiments of pile marking for subsequent bracket installation are disclosed. A laser marker is installed on a pile in a row of piles to emit one or more laser projections onto a pile to generate one or more marks based on one or more offsets that are established during piles scanning and validation. These marks may be used to ensure correct subsequent bracket and solar table installation.
원문 (중국어)
In a large construction site, it can be challenging to maintain precise installation for multiple piles. If the piles are not installed accurately, subsequent installation process may have to be changed, adjusted, or adapted due to the actual pile construction. System and method embodiments of pile marking for subsequent bracket installation are disclosed. A laser marker is installed on a pile in a row of piles to emit one or more laser projections onto a pile to generate one or more marks based on one or more offsets that are established during piles scanning and validation. These marks may be used to ensure correct subsequent bracket and solar table installation.