Bridge and construction method of bridge
データ提供元:EPO OPS
本文を取得できませんでした。取得済みの書誌情報は引き続き確認できます。
案件概要
出願番号
CN202310304573
発明者
ZUO XUENA; RUAN HUIQIANG
出願日
Mar 21, 2023
公開日
Sep 24, 2024
パテントファミリーID
92777719
IPC分類
CPC分類
The invention discloses a bridge and a bridge construction method. The bridge comprises a track beam; the bridge pier assembly is arranged below the track beam, the bridge pier assembly comprises a bridge foundation and a bridge pier, the bridge foundation is arranged below the bridge pier, the bridge foundation comprises a first concrete part, a plurality of first main reinforcements, a plurality of second main reinforcements and a first sleeving piece, the first main reinforcements are arranged at intervals in the length direction, and the second main reinforcements are arranged at intervals in the width direction; the plurality of first sleeving pieces are arranged at intervals in the width direction; and the first sleeving piece is connected to the outer side of the second main reinforcement in a sleeving mode, the second main reinforcement can move relative to the first sleeving piece, and the first concrete part wraps part of the first main reinforcement and the first sleeving piece. The movable space is reserved through the first sleeving piece, so that in the connection construction of the track beam and the pier, more movable space is provided for the second main reinforcement through the first sleeving piece, other additional operations such as engineering rework or reinforcement planting caused by mutual conflict of the reinforcements can be avoided, and the construction period is prevented from being delayed.
EPO 調査資料
項目を選択すると、この公開文献の公式資料を取得します。
上の項目を選択して資料を取得してください。
外部リソース