検索に戻る
案件記録

Bridge and construction method of bridge

その他/未提供不明

データ提供元:EPO OPS

本文を取得できませんでした。取得済みの書誌情報は引き続き確認できます。

92777719ファミリー
§ Ⅰ

案件概要

出願人

BYD CO LTD

出願番号

CN202310304573

発明者

ZUO XUENA; RUAN HUIQIANG

出願日

Mar 21, 2023

公開日

Sep 24, 2024

パテントファミリーID

92777719

IPC分類

E01D19/02E01D19/12E01D21/00

CPC分類

E01D19/02E01D19/12E01D21/00

The invention discloses a bridge and a bridge construction method. The bridge comprises a track beam; the bridge pier assembly is arranged below the track beam, the bridge pier assembly comprises a bridge foundation and a bridge pier, the bridge foundation is arranged below the bridge pier, the bridge foundation comprises a first concrete part, a plurality of first main reinforcements, a plurality of second main reinforcements and a first sleeving piece, the first main reinforcements are arranged at intervals in the length direction, and the second main reinforcements are arranged at intervals in the width direction; the plurality of first sleeving pieces are arranged at intervals in the width direction; and the first sleeving piece is connected to the outer side of the second main reinforcement in a sleeving mode, the second main reinforcement can move relative to the first sleeving piece, and the first concrete part wraps part of the first main reinforcement and the first sleeving piece. The movable space is reserved through the first sleeving piece, so that in the connection construction of the track beam and the pier, more movable space is provided for the second main reinforcement through the first sleeving piece, other additional operations such as engineering rework or reinforcement planting caused by mutual conflict of the reinforcements can be avoided, and the construction period is prevented from being delayed.

EPO 調査資料

項目を選択すると、この公開文献の公式資料を取得します。

上の項目を選択して資料を取得してください。

特許調査ツール

外部リソース