CNIPA.AI
Back to Search
Dossier

PROGRESS PREDICTION METHOD, PROGRESS PREDICTION DEVICE, AND PROGRESS PREDICTION PROGRAM FOR PROJECT

InventionPending
15Claims · 3 independent
§ Ⅰ

Dossier Overview

Inventor

Kazuya FURUICHI; Eisuke OKI; Takehito YASUI

IPC Classification

G6Q 10/637G6Q 10/631G6Q 10/639

CPC Classification

G6Q10/637G6Q10/6312G6Q10/639

[TASK] To make it possible to predict, at an intermediate point of a step in an ongoing project, a progress including subsequent due dates with simple processing. [SOLUTION] A progress prediction method for a project including at least one step includes: acquiring data of a progress plan including a progress level of the step and an execution timing corresponding thereto; acquiring data of progress performance including a progress level of a completed part of the progress plan and an execution timing corresponding thereto; calculating, based on the data of the progress performance, a performance period from a reference time point of the step to a predetermined time point at which a predetermined progress level was achieved; calculating, based on the data of the progress plan, a plan period from the reference time point of the step to a time point at which a progress level same as the predetermined progress level is achieved; calculating, based on the performance period and the plan period, a progress evaluation index regarding progress of the step; and predicting, based on the progress evaluation index, data of the progress performance after the predetermined time point.

Original (Chinese)

[TASK] To make it possible to predict, at an intermediate point of a step in an ongoing project, a progress including subsequent due dates with simple processing. [SOLUTION] A progress prediction method for a project including at least one step includes: acquiring data of a progress plan including a progress level of the step and an execution timing corresponding thereto; acquiring data of progress performance including a progress level of a completed part of the progress plan and an execution timing corresponding thereto; calculating, based on the data of the progress performance, a performance period from a reference time point of the step to a predetermined time point at which a predetermined progress level was achieved; calculating, based on the data of the progress plan, a plan period from the reference time point of the step to a time point at which a progress level same as the predetermined progress level is achieved; calculating, based on the performance period and the plan period, a progress evaluation index regarding progress of the step; and predicting, based on the progress evaluation index, data of the progress performance after the predetermined time point.

External Resources